7th December 2017

//7th December 2017

7th December 2017

This Tiverton bathroom remodel took this bathroom from dated to modern sleek. This was a major re-working, with the removal of all wall boarding. Additionally we re-plasterboarded with moisture board, and finished the look with a skimmed ceiling and fully tiled floor. JDP Services completed all the plumbing apart from towel rad which is done by a trusted heating engineer; electrics completed by our trusted local tradesman, Pete Wilde.

2018-03-01T12:43:16+00:00